Figures at a glance

Need some quick figures about Singapore's train network?

This page contains figures that range from the number of stations, rail length and opening dates of each train line in Singapore.

Several MRT stations with a notable depth below ground level are also listed here.

Rail Length

Information as at 15 August 2024

Overview

MRT Lines Stations Length
North-South Line 27 45.0km
East-West Line 35 56.7km
North East Line 16 20.0km
Circle Line 30 35.4km
Downtown Line 34 41.9km
Thomson-East Coast Line 27 39.9km
Total MRT Length 141 238.9km
LRT Lines Stations Length
Bukit Panjang LRT 13 7.6km
Sengkang LRT 14 10.7km
Punggol LRT 15 10.3km
Total LRT Length 42 28.6km
Stations Length
Total MRT Length 141 238.9km
Total LRT Length 42 28.6km
Grand Total 183 267.5km

Interchange stations in the subtotal and grand total figures are counted once.
Station statistics exclude the double counting on Changi Airport Branch and Circle Line Extension, and stations not in operation.
*The subtotal and grand total counts prior to 12 November 2023 double- or triple-counted interchange stations.

Advertisement

Rail Length per Line

North-South Line North-South Line (NSL) Line Diagram

Date opened Sector Stations Length
Initial System
NS1 Jurong East - NS4 Choa Chu Kang
NS13 Yishun - NS27 Marina Bay
19 28.0km
10 February 1996 Woodlands Extension
NS5 Yew Tee - NS11 Sembawang
6 16.0km
23 November 2014 North-South Line Extension
NS28 Marina South Pier
1 1.0km
2 November 2019 Canberra station
NS12 Canberra
1 Built on existing line
Total Line Length NS1 Jurong East - NS28 Marina South Pier 27 45.0km

Advertisement

East-West Line East-West Line (EWL) Line Diagram

Date opened Sector Stations Length
Initial System
EW1 Pasir Ris - EW27 Boon Lay
26 39.0km
18 October 2001 Dover station
EW22 Dover
1 Built on existing line
28 February 2009 Boon Lay Extension
EW28 Pioneer - EW29 Joo Koon
2 3.8km
18 June 2017 Tuas West Extension
EW30 Gul Circle - EW33 Tuas Link
4 7.5km
Main Line EW1 Pasir Ris - EW33 Tuas Link 33 50.3km
Changi Airport Extension 2 6.4km
10 January 2001 CG1 Expo
8 February 2002 CG2 Changi Airport
Changi Airport Branch CG Tanah Merah - CG2 Changi Airport 2 6.4km
Total Line Length EW1 Pasir Ris - EW33 Tuas Link
CG Tanah Merah - CG2 Changi Airport
35 56.7km

Station statistics exclude the double counting of CG Tanah Merah station on the Changi Airport Branch.

Advertisement

North East Line North East Line (NEL) Line Diagram

Date opened Sector Stations Length
North East Line 16 20.0km
20 June 2003 NE1 HarbourFront - NE17 Punggol
15 January 2006 NE15 Buangkok
20 June 2011 NE11 Woodleigh
Total Line Length NE1 HarbourFront - NE17 Punggol 16 20.0km

Advertisement

Circle Line Circle Line (CCL) Line Diagram

Date opened Sector Stations Length
28 May 2009 Stage 3
CC12 Bartley - CC16 Marymount
6 5.7km
17 April 2010 Stage 1
CC1 Dhoby Ghaut - CC6 Stadium
6 5.4km
17 April 2010 Stage 2
CC7 Mountbatten - CC11 Tai Seng
5 5.6km
8 October 2011 Stage 4
CC17 Caldecott - CC24 Kent Ridge
7 9.8km
8 October 2011 Stage 5
CC25 Haw Par Villa - CC29 HarbourFront
5 6.8km
Main Line CC1 Dhoby Ghaut - CC29 HarbourFront 28 33.3km
14 January 2012 Circle Line Extension
CE1 Bayfront - CE2 Marina Bay
2 2.4km
Circle Line Extension CC4 Promenade - CE2 Marina Bay 2 2.4km
Total Line Length CC1 Dhoby Ghaut - CC29 HarbourFront
CE1 Bayfront - CE2 Marina Bay
30 35.7km

Station statistics exclude the double counting of CC4 Promenade station on the Circle Line Extension.

Advertisement

Downtown Line Downtown Line (DTL) Line Diagram

Date opened Sector Stations Length
22 December 2013 Phase 1
DT14 Bugis - DT19 Chinatown
6 4.3km
27 December 2015 Phase 2
DT1 Bukit Panjang - DT13 Rochor
12 16.6km
21 October 2017 Phase 3
DT20 Fort Canning - DT35 Expo
16 21.0km
Total Line Length DT1 Bukit Panjang - DT35 Expo 34 41.9km

Advertisement

Thomson-East Coast Line Thomson-East Coast Line (TEL) Line Diagram

Date opened Sector Stations Length
31 January 2020 Stage 1
TE1 Woodlands North - TE3 Woodlands South
3 2.9km
28 August 2021 Stage 2
TE4 Springleaf - TE9 Caldecott
6 13km
13 November 2022 Stage 3
TE11 Stevens - TE22 Gardens by the Bay
11 13.2km
23 June 2024 Stage 4
TE23 Tanjong Rhu - TE29 Bayshore
7 10.8km
Total Line Length TE1 Woodlands North - TE29 Bayshore 27 39.9km

Station statistics exclude TE10 Mount Pleasant and TE21 Marina South stations.

Advertisement

Bukit Panjang LRT Bukit Panjang LRT (BPLRT) Line Diagram

Date opened Sector Stations Length
6 November 1999 Main Loop
BP1 Choa Chu Kang - BP13 Senja
13 7.6km
6 November 1999
Closed 13 January 2019
BP6 Bukit Panjang - BP14 Ten Mile Junction 1 0.2km
Total Line Length 13 7.6km

Station statistics exclude BP14 Ten Mile Junction station.

Advertisement

Sengkang LRT Sengkang LRT (SKLRT) Line Diagram

Date opened Sector Stations Length
18 January 2003 STC Sengkang
1 -
18 January 2003 East Loop
SE1 Compassvale - SE5 Ranggung
5 4.5km
West Loop 8 6.2km
29 January 2005 SW4 Thanggam - SW8 Renjong
15 November 2007 SW2 Farmway
1 January 2013 SW1 Cheng Lim
27 June 2015 SW3 Kupang
Total Line Length 14 10.7km

Advertisement

Punggol LRT Punggol LRT (PGLRT) Line Diagram

Date opened Sector Stations Length
29 January 2005 PTC Punggol
1 -

29 January 2005
15 June 2007
20 June 2011
East Loop
PE1 Cove - PE5 Kadaloor
PE6 Oasis
PE7 Damai
7 5.2km
West Loop 6 5.1km
29 June 2014 PW5 Nibong - PW7 Soo Teck
29 February 2016 PW1 Sam Kee
29 December 2016 PW3 Punggol Point
31 March 2017 PW4 Samudera
15 August 2024 PW2 Teck Lee
Total Line Length 15 10.7km

Advertisement

Station Depth

Depth Station
43m DT21 Bencoolen
42m DT15 Promenade
40m TE20 Marina Bay
38m TE19 Shenton Way
35m CC2 Bras Basah
28m NE6 Dhoby Ghaut
21.3m EW14 NS26 Raffles Place
13m NS21 Newton

Advertisement

Please view this page in landscape mode.